Manufacturing Floor Management System

Foreseeson Software Benefits:

  • No Need To Change Your Current Database, MRP And ERP
  • No Viruses
  • No Network Management
  • No Long Term Contract
  • Simple And Easy To Setup
  • Easy To Use
  • Simple Synchronization With Your Database, MRP And ERP
  • Self Management
  • Go Online Quick
  • Access Anywhere And At Anytime ; 24 x 7 x 365
  • Secured Access Control System
    • Admin ; Only
    • Manager ; Only
    • Client ; Only
  • Low Monthly Fee
  • Safe Correct Software License Fee
  • Cloud Based

Module I 

From estimation / RFQ to manufacturing order (MO)

  1. Receive the RFQ from client
  2. Upload the BOM to the MRP / ERP system
  3. Analyze the manufacturing estimation
  4. Prepare, upload the quotation and notice to client
  5. Receive the P/O
  6. Create the MO to manufacturing

Reports

  • Client data
  • Client RFQ status
  • Quotation status
  • P/O and MO status

Module II 

From bill Of material (BOM)  to material verification for production

  1. BOM update
    1. Upload the BOM
    2. BOM ; manufacturer part number, company part number, seller part number
  2. Prepare for the material
    1. According to MO, material team prepare for the material
  3. Verification of materials before hand
    1. Verify the prepared materials are correct or not
    2. Also verify the quantity of prepared materials (How many in bulk / reel or cut-tape)

Reports

  • Material status for each MO
  • Material dispatch status for each MO / all MO
  • Material quantity status for each MO

Module III

From material preparation to shipping completion

  1. Schedule of each MO according to the initial estimation
  2. Material status of each MO
  3. The status of each procedure of each MO
  4. Failure rate of each procedure of each MO
  5. Comparison of initial estimation and actual manufacturing time of each MO
  6. Shipment
  7. Completion of MO
  8. Invoicing to client and notice to client

Reports

  • Manufacturing schedule date by date
  • Manufacturing stage/procedure report date by date
  • Detailed stage/procedure report of each MO
  • Comparison of estimation and actual manufacturing time
  • MO status report
“All trade names, marks and logos used here belong to the proper owners.”
“The Specification and Terms/Conditions of the products and services could be changed from time to time. The Buyer should reconfirm the Specification and Terms/Conditions before the purchasing.”
“All documents should be used only for Reference for the business, not for any other purpose.”
Close Menu